Think before you dig!
Don't waste ordinary buckets
Whether a machine spends its days loading rubble into crushers, ripping up concrete foundations or digging rock, you will not get economic life from a standard bucket - only a specially constructed bucket will keep on top of the job.
You need a bucket where every single design parameter - top tube, cutting edge, teeth, steel pate - has been up-rated to deal with the challenge. You can't start with a standard bucket and add to it.
Serious damage
BROKEN BEYOND REPAIR
Unfortunately, all too often, the time that the machine owner or operator realises the severity of the job is only when they have already destroyed a general purpose or HD bucket. In ordinary digging, these buckets would have been perfectly good and lasted many years, but in an extreme application, they are often broken beyond repair.
XHD BUILD OPTIONS

AS SEEN ON TOUGH SITES:
We Build Them Tough - feel sorry for the rocks!
Building An XHD Rock Bucket
Every single XHD rock bucket is custom built. This is just a single example.
You need to allow 14-21 days for a typical build.